Information on Result #547675

There is no linear OA(239, 49, F2, 20) (dual of [49, 10, 21]-code), because construction Y1 would yield
  1. linear OA(238, 45, F2, 20) (dual of [45, 7, 21]-code), but
  2. OA(210, 49, S2, 4), but

Mode: Bound (linear).

Optimality

Show details for fixed k and m, n and k, k and s, k and t, n and m, m and s, m and t, n and s, n and t.

Compare with Markus Grassl’s online database of code parameters.

Other Results with Identical Parameters

None.

Depending Results

None.