Information on Result #547750

There is no linear OA(397, 225, F3, 59) (dual of [225, 128, 60]-code), because construction Y1 would yield
  1. OA(396, 144, S3, 59), but
    • the linear programming bound shows that M ≥ 2236 401438 247250 718182 900374 183456 399210 453427 110900 255699 874712 354347 141530 819695 / 326304 173287 366006 276464 537104 634223 > 396 [i]
  2. linear OA(3128, 225, F3, 81) (dual of [225, 97, 82]-code), but

Mode: Bound (linear).

Optimality

Show details for fixed k and m, n and k, k and s, k and t, n and m, m and s, m and t, n and s, n and t.

Compare with Markus Grassl’s online database of code parameters.

Other Results with Identical Parameters

None.

Depending Results

The following results depend on this result:

ResultThis
result
only
Method
1No linear OA(3131, 228, F3, 83) (dual of [228, 97, 84]-code) [i]Construction Y1 (Bound)