Information on Result #547849

There is no linear OA(4107, 235, F4, 75) (dual of [235, 128, 76]-code), because construction Y1 would yield
  1. OA(4106, 143, S4, 75), but
    • the linear programming bound shows that M ≥ 189 312298 968815 860250 485793 283965 413843 284713 743252 821000 560707 597443 674955 116200 018233 524224 / 27631 043169 340831 430975 152245 > 4106 [i]
  2. linear OA(4128, 235, F4, 92) (dual of [235, 107, 93]-code), but

Mode: Bound (linear).

Optimality

Show details for fixed k and m, n and k, k and s, k and t, n and m, m and s, m and t, n and s, n and t.

Compare with Markus Grassl’s online database of code parameters.

Other Results with Identical Parameters

None.

Depending Results

None.