Information on Result #547970

There is no linear OA(722, 46, F7, 19) (dual of [46, 24, 20]-code), because construction Y1 would yield
  1. OA(721, 25, S7, 19), but
  2. linear OA(724, 46, F7, 21) (dual of [46, 22, 22]-code), but

Mode: Bound (linear).

Optimality

Show details for fixed k and m, n and k, k and s, k and t, n and m, m and s, m and t, n and s, n and t.

Compare with Markus Grassl’s online database of code parameters.

Other Results with Identical Parameters

None.

Depending Results

The following results depend on this result:

ResultThis
result
only
Method
1No linear OA(731, 53, F7, 27) (dual of [53, 22, 28]-code) [i]Construction Y1 (Bound)