Information on Result #548067

There is no linear OA(397, 224, F3, 59) (dual of [224, 127, 60]-code), because construction Y1 would yield
  1. OA(396, 144, S3, 59), but
    • the linear programming bound shows that M ≥ 2236 401438 247250 718182 900374 183456 399210 453427 110900 255699 874712 354347 141530 819695 / 326304 173287 366006 276464 537104 634223 > 396 [i]
  2. linear OA(3127, 224, F3, 80) (dual of [224, 97, 81]-code), but

Mode: Bound (linear).

Optimality

Show details for fixed k and m, n and k, k and s, k and t, n and m, m and s, m and t, n and s, n and t.

Compare with Markus Grassl’s online database of code parameters.

Other Results with Identical Parameters

None.

Depending Results

None.