Information on Result #548593

There is no linear OA(391, 100, F3, 61) (dual of [100, 9, 62]-code), because construction Y1 would yield
  1. linear OA(390, 96, F3, 61) (dual of [96, 6, 62]-code), but
  2. OA(39, 100, S3, 4), but

Mode: Bound (linear).

Optimality

Show details for fixed k and m, n and k, k and s, k and t, n and m, m and s, m and t, n and s, n and t.

Compare with Markus Grassl’s online database of code parameters.

Other Results with Identical Parameters

None.

Depending Results

None.