Information on Result #3177889
Digital (57, 99, 294)-net over F32, using 2 times m-reduction based on digital (57, 101, 294)-net over F32, using
- generalized (u, u+v)-construction [i] based on
- digital (7, 21, 98)-net over F32, using
- net from sequence [i] based on digital (7, 97)-sequence over F32, using
- Niederreiter–Xing sequence construction II/III [i] based on function field F/F32 with g(F) = 7 and N(F) ≥ 98, using
- net from sequence [i] based on digital (7, 97)-sequence over F32, using
- digital (7, 29, 98)-net over F32, using
- net from sequence [i] based on digital (7, 97)-sequence over F32 (see above)
- digital (7, 51, 98)-net over F32, using
- net from sequence [i] based on digital (7, 97)-sequence over F32 (see above)
- digital (7, 21, 98)-net over F32, using
Mode: Constructive and linear.
Optimality
Show details for fixed k and m, k and s, k and t, m and s, m and t, t and s.
Other Results with Identical Parameters
None.
Depending Results
None.