Information on Result #62844

There is no OA(2593, 97, S25, 90), because the linear programming bound shows that M ≥ 917 366046 106511 319204 310488 250559 166131 581647 062117 601772 786429 813888 045207 279411 397468 873458 869997 872255 908077 931962 907314 300537 109375 / 81263 > 2593

Mode: Bound.

Optimality

Show details for fixed k and m, n and k, k and s, k and t, n and m, m and s, m and t, n and s, n and t.

Other Results with Identical Parameters

None.

Depending Results

The following results depend on this result:

ResultThis
result
only
Method
1No OA(2594, 98, S25, 91) [i]Truncation
2No OA(2595, 99, S25, 92) [i]
3No OA(2596, 100, S25, 93) [i]
4No OA(2597, 101, S25, 94) [i]
5No OA(2598, 102, S25, 95) [i]
6No OA(2599, 103, S25, 96) [i]
7No OA(25100, 104, S25, 97) [i]
8No OA(25101, 105, S25, 98) [i]
9No OA(25102, 106, S25, 99) [i]
10No OOA(2593, 97, S25, 2, 90) [i]Depth Reduction
11No linear OA(2594, 164, F25, 90) (dual of [164, 70, 91]-code) [i]Construction Y1 (Bound)