Information on Result #793826

Digital (42, 60, 144)-net over F3, using trace code for nets based on digital (2, 20, 48)-net over F27, using

Mode: Constructive and linear.

Optimality

Show details for fixed k and m, k and s, k and t, m and s, m and t, t and s.

Other Results with Identical Parameters

None.

Depending Results

The following results depend on this result:

ResultThis
result
only
Method
1Digital (43, 61, 144)-net over F3 [i]Net Duplication
2Digital (42, 59, 144)-net over F3 [i]m-Reduction
3Linear OOA(360, 144, F3, 2, 18) (dual of [(144, 2), 228, 19]-NRT-code) [i]Extracting Embedded OOA
4Linear OOA(360, 144, F3, 3, 18) (dual of [(144, 3), 372, 19]-NRT-code) [i]
5Linear OOA(360, 144, F3, 4, 18) (dual of [(144, 4), 516, 19]-NRT-code) [i]
6Linear OOA(360, 144, F3, 5, 18) (dual of [(144, 5), 660, 19]-NRT-code) [i]