Best Known (175−60, 175, s)-Nets in Base 2

(175−60, 175, 68)-Net over F2Constructive and digital

Digital (115, 175, 68)-net over F2, using

(175−60, 175, 84)-Net in Base 2 — Constructive

(115, 175, 84)-net in base 2, using

(175−60, 175, 117)-Net over F2 — Digital

Digital (115, 175, 117)-net over F2, using

(175−60, 175, 643)-Net in Base 2 — Upper bound on s

There is no (115, 175, 644)-net in base 2, because

Go to , , .